| | | 20 Oct 2005 24.5km 11.0km/h 165m climbing 152mm cranks night | | 22 Oct 2005 Rancho San Antonio 18.6km 11.2km/h 280m climbing 152mm cranks dirt | 23 Oct 2005 to Shoreline and back 34.0km 11.7km/h 235m climbing 152mm cranks gravel |
| 25 Oct 2005 27.8km 13.5km/h 180m climbing 152mm cranks night | | 27 Oct 2005 23.7km 13.6km/h 165m climbing 152mm cranks night | | | 30 Oct 2005 Rob's Ride 33.4km 9.8km/h 640m climbing 152mm cranks dirt
|
| | | 03 Nov 2005 10.7km 13.5km/h 50m climbing 152mm cranks dirt, grass | 04 Nov 2005 31.0km 13.6km/h 250m climbing 152mm cranks night | | 06 Nov 2005 Lexington reservoir 20.7km 11.1km/h 400m climbing 152mm cranks dirt |
07 Nov 2005 32.7km 13.7km/h 235m climbing 152mm cranks rain, night | | | 10 Nov 2005 11.8km 13.3km/h 120m climbing 140mm cranks dirt, gravel | | 12 Nov 2005 14.2km 14.1km/h 220m climbing 140mm cranks
| 13 Nov 2005 Aptos to Moss Landing and back 60.9km 13.5km/h 870m climbing 140mm cranks
|
| | | 17 Nov 2005 15.9km 14.8km/h 180m climbing 140mm cranks
| | | 20 Nov 2005 Rob's Ride 31.4km 10.7km/h 610m climbing 152mm cranks dirt
|
21 Nov 2005 33.2km 13.7km/h 400m climbing 140mm cranks (dirt, gravel) (night) | | | 24 Nov 2005 8.6km 12.8km/h 0m climbing 140mm cranks 10kg pack | 25 Nov 2005 8.6km 14.0km/h 35m climbing 140mm cranks 10kg pack | | 27 Nov 2005 Aptos to Moss Landing and back 62.6km 13.5km/h 810m climbing 140mm cranks
|
| | | | | | 04 Dec 2005 Rob's Ride 31.4km 11.2km/h 575m climbing 152mm cranks dirt |
| 06 Dec 2005 Pulgas Water Temple 74.3km 13.6km/h 1080m climbing 140mm cranks
| | | 09 Dec 2005 Stevens Canyon 25.9km 12.8km/h 370m climbing 140mm cranks
| | |
| | | 15 Dec 2005 8.3km 14.0km/h 0m climbing 140mm cranks night | | | |
| | 21 Dec 2005 San Diego to Mexico 48.8km 12.0km/h 650m climbing 140mm cranks (heavy traffic) (night) | | 23 Dec 2005 hilly San Diego suburbs 10.6km 10.8km/h 400m climbing 140mm cranks
| | |
26 Dec 2005 Rob's Ride variant 38.7km 10.9km/h 780m climbing 140mm cranks loose crank | | 28 Dec 2005 Lexington reservoir 20.9km 10.4km/h 400m climbing 140mm cranks
| 29 Dec 2005 Capitola to Wilder Ranch and back 33.9km 12.7km/h 410m climbing 140mm cranks
| | | |
| | | 05 Jan 2006 Stevens Canyon 9.2km 11.3km/h 180m climbing 140mm cranks new brake, new tube | 06 Jan 2006 Palo Alto - Woodside loop 28.4km 13.1km/h 450m climbing 140mm cranks
| | 08 Jan 2006 Highway 1: Santa Cruz to Big Basin 74.2km 12.6km/h 1090m climbing 140mm cranks
|
| | 11 Jan 2006 Palo Alto - Woodside - Hwy 92 and back 54.2km 12.6km/h 685m climbing 140mm cranks
| | | | 15 Jan 2006 Eureka Canyon loop 61.5km 11.0km/h 1050m climbing 152mm cranks
|